Wednesday, May 6, 2020

Josef pieper essay free essay sample

Contemplation is the essence to being happy. It is a set way of thinking which embraces having a plan or observing our future actions. We are happy because we have a plan through contemplation. We cannot achieve happiness with out thinking how to accomplish it. Completion or fulfillment means no more changes. This is completed through potential. Our potentials are our talents and as long as we can keep them running we will be happy, but these talents need to have time and space to practice them to be perfected.Happiness is the good, which Peppier brings to attention, we find the good In our talents, and by practicing these talents we can achieve happiness. We are not born happy people It Is something that needs to be attained. Peeler highlights that we want to be complete perfect actual beings. Man craves nature by happiness and bliss (Peppier 20). I agree with Peppier that happiness is achieved through contemplation but I disagree with his statement that only a person is capable of being happy-and unhappy-at all (20). We will write a custom essay sample on Josef pieper essay or any similar topic specifically for you Do Not WasteYour Time HIRE WRITER Only 13.90 / page Even though animals live by instinct and thats what defines them, Peppier was wrong in saying that they cannot achieve happiness. Perhaps animals dont need contemplation to achieve happiness but I believe they can be happy. Any living thing that has the capability to have emotions is capable of feeling some sort of happiness. Animals are capable of a range of emotions, such as happiness, sadness, empathy, grief, curiosity, anger, anxiety and fear. We live by individually planning our lives, by nature we can not have a plan with out thinking (contemplation).To want happiness, happens without knowing our reason. It Is an act of the mind, also as nature Intended the desire for happiness Is of precisely this character; It Is willing by nature, .. An act of the mind and a natural process at one and the same (Peppier 22). Contemplation is necessary for happiness. All human beings will be happy if they contemplate. We are thinking animals something that we identify ourselves with the ability of thinking. Contemplation is a loving attainment of awareness. Consciousness is crucial to being human its a principle, which we identify ourselves with. Awareness is where our human identity is. Our happiness is dependent on our awareness. It is our defining property that defines who we are. Works Cited Peppier, Josef and Richard Winston. Happiness and Contemplation. Translated by Richard and Clara Winston. Up 128. London: Faber Faber, 1958: Print. Josef Peppier does an invigorating Job defining how Happiness comprehends a peppiness consists in contemplation (Peppier 13).

Friday, May 1, 2020

Information Governance Practices of Employee

Question: Describe about the Information Governance for Practices of Employee. Answer: The essay brings into focus the practice of employee fraud due to mishandling of information system. Although organizations have different information control system to prevent any fraudulent action, but dishonest employees are able to identify the weakness in the system. Information system fraud can lead to immense financial losses in the company. Employee with such intention of fraud are great risk to the organization and its is the duty of the internal auditors to identify such red flags within the financial information system. This essay analyzes a case study related to employee fraud in Healthy Hospital where internal controls of information technology and management was breached and business records were falsified. The intention of this case study analysis is to learn from such situations and analyzing risk in the system carefully. The case is an appropriate example of variety of risk a company is exposed to due to fraudulent employees. It brings into focus the relevant action that an internal auditor must take to improve internal controls and prevent fraudulent activities in the organization in the future. In order to understand the reason that contributed to fraud in the Healthy Hospital, it is necessary to provide a brief summary of the case. The facts about Healthy Hospital revealed that the their software system have been recently upgrade after installation in the 1990s. Due to decrease in annual profits in the hospital, HH decided to reduce their annual operating cost by 25 million dollar. On review of areas where operation cost can be reduced, they decided to eliminate clerk position due to decrease in the medical supply vendors. However due to complaints of slow paymemt from the vendors, Matt Harris, the son of Sharon Harris (HHS senior A/P clerk) was recruited as a temporary clerk without background investigation. After some time he also became a permanent employee and he was suspected for large cash disembursement in the absence of internal audit manager. Hence from this case analysis, fraud took place because of inaction of A/P manager, Tracy Downs. The standard operating pro cedure for recruiting employees in sensitive position was not followed by Tracy. He ignored background investigation of Matt as felt it was not required for temporary employees. Another breach was seen in ignoring companys policy against nepotism by which employees from same family working in sensitive positions like finance and many others are prohibited from working in HH to protect the corporate documents. Hence action of Tracy conflict with hospital procedure for recruiting employees and lead to fraud case. Besides this in term of business process at HH, Tracy had the responsibility to update and maintain accuracy of accounts payable data. The fraud occurred because Tracy Down did not deleted Matts account payable vendor file even after he became a full time employee after working as an independent contractors. Even for permanent recruitment, he was not interviewed according to HHs policy. The control for internal information system was also weak in the hospital so Matt could ge t access to pre-signed checks. It is very much essential to know employee through background check or interview to prevent any fraud. The case study revealed that mostly fraud occurred due to weak internal controls which Matt could detect and took unfair advantage of it. This fraud could have been averted if Tracy Down had improved internal controls. The first action would be to strengthen internal controls by doing comprehensive review of risk in the organization. The auditors should have strict control to ensure that all corporate policies and practices are strictly followed by each member of the company (Disterer 2013). Another important action is to clearly segregate duty policies. It means determining which employees should have access to authorization and control over corporate documents (Choi et al. 2013). It was a severe mistake by HH to assign Matt with semi-weekly cash disbursement run. This gave him the chance to successfully carry out his fraudulent intention. Lack of action to segregate duty responsibility is the reason for many fraud events in the company. Only restricted individuals such as the Accou nt Payable Manager should have the authority to initiate or approve a transaction. In case of pre-established finance, there should dual signature and management approval on check amount. Random auditing is also essential to protect financial transactions and it will also eliminate any chance of manipulation of corporate information by dishonest employees (Vance et al. 2013). Other than Harris, Tracy Downs, the A/P manager is highly accountable for this fraud as she hired him without background investigation and following HHs policy for recruitment. James Smith, the CFO of HH is also indirectly responsible for the fraud as he allowed Matt to be the employee despite warning by Mr. Walters on the recruitment going against the policy on nepotism. Elinor Linz and Tracy Down are also responsible for not deleting accounts payable independent contractor account of Matt. Mailing of physical to hospitals vendor checks also lead to fraud. The internal audit manager could have helped to prevent the fraud had he taken action initially when he detected red flags of fraud in the information system. He had the responsibility of detecting and preventing fraud early on in the system. They should manage risk of fraud and then take efforts to monitor any suspicious activities within the organization (Donovan et al. 2014). However, to carry out this duty effectively, internal audit manager needs to have superior level of theoretical knowledge to identify signs of fraud and attitude change in employees. They should be attentive enough to further investigate a suspicious case and inform responsible person about it. Conducting annual auditing is also a critical activity to reduce any chance of fraud. They should support management to establish an anti-fraud policy, assess risk in business process, identify connection between crime and internal controls and immediately report on the matter to the audit committees (Ege 2014). Accord ing to Principles of audit, audit managers should have professional skepticism attitude to be accountable enough to reduce existence of fraud. Hence, such action could help to avert fraud cases (Nijenhuis 2016). Technical control may help in suspecting and protecting organization against fraud. Technical control may be done to enhance system of checks and balances. It will ensure that no employees have control over financial transactions in an organization. For example in case of HH, they should have authorized disbursement and other pay roll activities only to designated persons for the job and not giving that responsibility to Matt. Second option for technical control would be to carry out reconciliation of bank account on a monthly basis to make sure the process flows transparently. For HH particularly, it will be essential for them to examine checks and ensure that they are not issues without permission from trusted authorities. It will also mean identifying financial activity on a regular basis and looking after major operations. HH should also implement accurate policies for cash disbursement, conflict of interest, using companys assets and handling recruitment activities (Power 2013). An information auditing plan for Healthy Hospital can be made for fraud prevention activities. The first plan of action will be to correctly apply the companys code of conduct regarding recruitment and procedure and communicate it to all staff members. Secondly, it will be essential to regularly review that all employee conform to set standard of business and commit to the management of integrity of HH. A fully planned programme of communication and training will be beneficial to enhance control on fraud reporting and prevention (Laxman et al. 2014). The internal manager of HH must be vigilant enough to notice change in employees attitude and behavior. Establishing an internal control system will be most important for HH so that they can prevent future cases of fraud like cash disbursements done by Matt Harris. The aim of internal control system at HH will be to respect separate duties of each employees. An employee should never be allowed to carry out dual role in any situation (Sha nmugam et al. 2012). Practices of employee managing both back office and front office activities should be strictly prohibited. A responsible person can be made accountable to examine staff competence, investigate each new employee and regularly carry out evaluation of performance. Proactive actions should be planned by internal managers. For example they can do screening for background check to monitor level of conviction in employees, search necessary database to identify dishonest connection between employees. It will help in identifying those actions which normally goes unnoticed earlier in HH (Carcello et al. 2015). The essay based on critical case analysis of Healthy Hospital highlighted the practice of fraudulent scheme executed by dishonest employees by misusing information system of the organization. In the case analysis, serious crime was committed by Matt when he was found guilty of large cash disbursements. The study of the case also revealed that such activities mainly take place due to weak internal controls and lack of accountability among internal audit managers and other staff. In HH, the account payable manager Tracy Downs was also indirectly responsible for triggering fraudulent activities as he did not followed companys policies for recruitment and nepotism. Mistakes also occurred in their duty of reviewing accounts payable data. Hence, it is necessary that technical and internal control be enhanced to reduce future case of information system fraud. Reference Carcello, J.V., Eulerich, M., Masli, A. and Wood, D.A., 2015. The Value to Management of Using the Internal Audit Function as a Management Training Ground.Available at SSRN 2691535. Choi, J.H., Choi, S., Hogan, C.E. and Lee, J., 2013. The effect of human resource investment in internal control on the disclosure of internal control weaknesses.Auditing: A Journal of Practice Theory,32(4), pp.169-199. Disterer, G., 2013. Iso/iec 27000, 27001 and 27002 for information security management. Donovan, J., Frankel, R., Lee, J., Martin, X. and Seo, H., 2014. Issues raised by studying DeFond and Zhang: What should audit researchers do?.Journal of Accounting and Economics,58(2), pp.327-338. Ege, M.S., 2014. Does internal audit function quality deter management misconduct?.The Accounting Review,90(2), pp.495-527. Laxman, S., Randles, R. and Nair, A., 2014. The fight against fraud: internal auditors can use COSO components to develop and deliver an effective fraud mitigation program.Internal Auditor,71(1), pp.49-54. Nijenhuis, R.G., 2016. Prevention of Dutch fraud cases: a multiple case study on the effectiveness of internal control in the process of financial statement fraud prevention. Power, M., 2013. The apparatus of fraud risk.Accounting, Organizations and Society,38(6), pp.525-543. Shanmugam, J.K., Haat, M.H.C. and Ali, A., 2012. An Exploratory Study of Internal Control and Fraud Prevention Measures in SMEs.Small,100, pp.18-2. Vance, A., Lowry, P.B. and Eggett, D., 2013. Using accountability to reduce access policy violations in information systems.Journal of Management Information Systems,29(4), pp.263-290.

Saturday, March 21, 2020

How Can Events Contribute to Destination Image Enhancement free essay sample

How can events contribute to destination image enhancement? Give example. A destination images is a psychological concept, studied in multitudinous fields, refers to an individuals perception acquired regards to a particular destination. In tourism studies, the term destination image generally refers to tourist based image. Crompton (1979) defined destination images as the summation of ideas, beliefs and impressions that a persona has of a destination. Furthermore, Milman and Pizam (1995) illustrated destination image as a combination of natural, social attributes, cultural and the infrastructure of the destination. An image of a destination can be enhanced, revolutionized or even destroyed from staging up an event. Events can have several impacts towards the host country, mainly economic, cultural, social and environmental. As an important motivator, events can increase tourists to a region, provide employment, generate revenue which may positively impact on the economy in the region and build brand equity (Getz 2008, Richie Daryl, 2004). We will write a custom essay sample on How Can Events Contribute to Destination Image Enhancement or any similar topic specifically for you Do Not WasteYour Time HIRE WRITER Only 13.90 / page It can also improve the image of the destination for the visitors, as well as to the own community, which may also represent as positive social benefit (Boo Busser, 2006). Yet however research and analysis found that economic benefits from events are disaggregated, where some of the businesses are actually doing worse off during the event (Putsis, 1998). To overcome the arising question of a host country, how to achieve and leverage long term economic gain, special attention were brought onto image enhancement as it entitle the capability to shape tourist perceptions of the region and thereby delivering a long term economic gain (Kotler et al. , 1993). Knowing that image enhancement is part of the solution to resolve and improve economy in a long-run, the challenge ahead will be how host country can optimises the effect of an event to contribute to destination image enhancement due to the fact that tourists are more likely to travel to a destination with stronger and positive image (Woodside Lysonski, 1989). An image that a person possesses of a particular destination can be influences by information from different sources. With technological advancement, improved media management techniques was developed to optimize media broadcasting coverage of an event, enhancing the effects of events on the host destinations image (Chalip, 2002). Using quantity and content of images and stories of the destination, destination image can be methodically enhanced by harmonizing them into the event. This may be achieved when there is a strong linkage between the advertising and reporting of the event and the host destination. The use of event imagery and mentions in promotions as well as advertising can also enhance the image of the host destination (Richie Daryl 2004). As for event advertising, a fundamental linkage between the host destination and event must co-exist. Identifying the key aspects of the host destination which are likely to appeal to the target audience is essential. Such key aspects include famous icon, natural features, special characteristics or climate. These features can be exploited and infuse as background visuals or attributing these aspects of the host destination into advertising the event which most likely will contribute to destination image enhancement (Richie Daryl 2004). Events generally will captivate reporters and most of them will be reporting on the event itself, generating little coverage of the host destination. Like all other media, reporters seek interesting background material to provide colour for their report of the event. To enhance the image of the destination, the host can provide that colour using the aspects of the destination, assisting reporters by providing them useful stories and locating places with extraordinary sceneries (Richie Daryl 2004). Doing so, these will not only increase the coverage of the host destination, but also minimize the possibility of negative coverage. One such event that successfully demonstrated these strategies was the Sydney Olympic Games. With 15,000 unaccredited media arrived to the Sydney games, a media centre was specifically created. The Australia Tourism Commission understood that when there was a lack of facilities and support given to these media, they would prone to write negative stories about the host city and country, which will eventually resulting to negative destination image. By opening a media centre, high rate of satisfaction was surveyed out by the users. Press conference and stories about Australia was provided to these media and journalists during the games to help them write interesting and positive stories about the destination and event that showcased the country (Chalip, 2002). Another tactic used by Seoul Olympics to increase the destinations exposure and images was showcasing their key aspects of the city during the games. Marathon route was strategically plot out to showcase the city, park and Han River. Correspondingly, television cameras and photographer were stationed at angles which will provide the best views of the city, river and parks. Hence after, visual of these images will be in television coverage, newspaper and magazines, showcasing and increase the destinations exposure positivity (Richie Daryl, 2004). Events on the flipside can be use as a strategy of correcting negative image or changing perceptions of a destination (Ahmed, 1991). Six techniques proposed by Ahmed (1991) to reposition a destinations image. These includes: using selective promotion, scheduling mega-events, bidding to host international travel and tourism conventions, capitalizing on positive images of component parts, organizing familiarization tours and taking advantage of a negative image. Conversely, poor organization and management of event may lead in negative image of a destination. Inadequate matching of events and destination may cause negative brand building, eventually results to negative image (Jayswal, 2008). Similarly, event may circumscribe to the destinations image as more involvement will be on the event itself, rather than the destination which will have not a long term effect. One such event was the 1995 Smiths Balloon Festival. Suh (1996) evaluated that the event posted negative impacts on the image destination, due to the poor organization of the event studied. Staging up an event in effort to enhance a destination image must undergo careful and precise planning and organizing. Various strategies are available and when use correctly during an event, will help in enhancing an image of the destination. 965 words) References Ahmed, Z. U. (1991). Marketing your community: Correcting a negative image. Cornell HRA Quarterly, February, 24-27. Boo, S. , Busser, J. A. (2006). Impact analysis of a tourism festival on tourists destination images. Event Management, 9, 223-237. Chalip, L. (2002). Using the Olympics to optimise tourism benefits: University Lecture on the Olympics. Retrieved fro m http://olympicstudies. uab. es/lectures/web/pdf/chalip. pdf Crompton, J. L. (1979). An assessment of the image of Mexico as a vacation destination and the influence of geographical location upon that image. Journal of Travel Research, 17, 18-24. Getz, D. (2008). Event Tourism: Definition, Evolution, and Research. Tourism Management, 29, 403-428. Jayswal, T. (2008). Events Tourism: Potential to build a brand destination. Conference on Tourism in India Challenges Ahead, 252 262. Kotler, P. , Haider, D. H. , Rein, I. (1993). Marketing Places: Attracting Investment, Industry, and Tourism to Cities, States, and Nations. New York: Free Press. Milman, A. , Pizam, A. (1995). The role of awareness and familiarity with a destination: The central Florida case. Journal of Travel research, 33, 21-27. Putsis, W. P. (1998). Winners and losers: Redistribution and the use of economic impact analysis in marketing. Journal of Macromarketing, 18, 24-33 Richie, B. W. , Daryl, A. (2004). Sport Tourism: Interrelationships, Impacts and Issues. Great Britain: Cromwell Press. Suh, J. (1996). Impact of a special event on the image of a host region. Unpublished MS thesis. University of Utah. Woodside, A. G. , Lysonski, S. (1989). A general model of traveller destination choice. Journal of Travel Research, 17(4), 8-14.

Thursday, March 5, 2020

More Words That Turn on the Root Vert

More Words That Turn on the Root Vert More Words That Turn on the Root Vert More Words That Turn on the Root Vert By Mark Nichol A recent post dealt with many of the English words based on the Latin verb vertere, meaning â€Å"turn,† focusing on those that precede the root vert with a prefix, and their various grammatical forms. This follow-up post defines some additional words in the vertere family: those beginning with vert. Those with the variant stem vers rather than vert will be outlined in a subsequent post. Vertigo originally meant â€Å"a spinning or whirling movement† and later came to refer to a form of dizziness in which the sufferer has a sensation suggestive of spinning or whirling. The related adjective is vertiginous, which also applies neutrally to any spinning motion or judgmentally to frequent and unnecessary change. A vertebra (plural: vertebrae) is a segment of the system of bones that constitute the spine, or backbone, of vertebrates; that last word refers to two classes of animals, the higher and lower vertebrates, possessing a spine of bone or cartilage or a similar process. It also serves as an adjective, as does vertebral- the spinal column is also called the vertebral column- and as an adjective, vertebrate also means â€Å"well formed or â€Å"well organized,† though this usage is rare. The connection to vertere is of the spine’s hinge-like quality, which allows animals to turn or bend their bodies. An invertebrate is an animal lacking a spine or a similar process. In Latin, vertex and vortex both mean â€Å"whirl,† but in English the terms are distinct: Vertex applies to the top of the head, the highest point (such as a summit), or a point farthest from the base of an object or shape. (It also applies in geometry to the point at which two lines or curves meet.) A vortex, meanwhile, is a literal or figurative whirlpool. The adjective vertical is related and in one sense means â€Å"located at the highest point† but usually means â€Å"upright† or â€Å"lengthwise† and is an antonym of horizontal. In economic and sociological contexts, it can refer, respectively, to the scope of activity in the production of goods or to hierarchy. Want to improve your English in five minutes a day? Get a subscription and start receiving our writing tips and exercises daily! Keep learning! Browse the Vocabulary category, check our popular posts, or choose a related post below:10 Rules for Writing Numbers and NumeralsFlier vs. FlyerDozen: Singular or Plural?

Monday, February 17, 2020

Will China Be The Next Superpower Essay Example | Topics and Well Written Essays - 1000 words

Will China Be The Next Superpower - Essay Example China will be the next super power as it is the biggest Asian country and has emerged magnificently economically all around the globe. The pros of China becoming the next super power support their discussion through means of economy, trade, and technology and labor force. By nominal GDP, China is the second largest economy with a growth rate average of almost double figures for over three decades. It is the fastest growing economy, and it is concluded by many analysts that by the year 2020, it will be the largest economy of the world surpassing its rival country. America’s growth rate in comparison with China is very low, and it is also indulged in two wars, which makes it impossible to compete and lose its lead soon. In the trade, China is the largest exporter and second largest importer, which enhance its Balance of Trade, which is fruitful for its economy. China is also in contract with many other nations and does free trade with them, which increases its imports and exports and develops good relations with them. It has made prompt advancement in areas like infrastructure and high-tech manufacturing. In recent decades, China has also developed swiftly in science and technology with the help of its government, as it is considered socio-economic development of the country and also its national prestige. China is the most populous country, with the largest labor force, which helps the boom in their economy and is one of the reasons that will lead China in becoming the next super power. The people who are in favor to the debate that China will become the next super power give the above reasons for their support, as they are certainly the pros towards the topic. The group of cons of this topic strongly feels that China will not leave behind America and become the next super power. They believe that nations cannot become a super power

Monday, February 3, 2020

Access to Higher Education Assignment Example | Topics and Well Written Essays - 1500 words

Access to Higher Education - Assignment Example umber of domestic students under two scenarios 2006-2021 by capital city Available at: http://www.universityworldnews.com/filemgmt_data/files/AUR_51-01_Birrell_Edwards.pdf Some of those recommendations include reducing the cost of access to higher education, strengthening the domestic universities to provide quality education to Australian citizens. In addition, due to the inequality level in accessing education especially among people from the lower socio-economic class, the government should aim at empowering these people to enable them compete favourably with the other social classes for positions in the universities. Discussion of the contributing factors Higher education in Australia has been faced with many challenges, these challenges have led to low enrolment in the universities and consequently a small population of the country has graduate qualifications. Some of the factors that have caused the low levels of university enrolments include the following. 1. The high cost of education- One challenge that makes increase in access of higher education hard to achieve is the cost implication that comes with it (Chen & St John, 2011, p23). The cost of acquiring a degree is very high in the country such that not everyone in the society can be able to match. This high cost of acquiring a degree is a challenge especially to individuals in the lower socio-economic class (Harmon 2010, p. 75). Very often, you will find needy students that are very bright but cannot afford to further their studies. The only hope for these students is either to find a sponsor or the government loans and grants provided by governments. The very bright ones are at an advantage because they are likely to receive sponsorship or even get free education from some universities that do this as part... The assignment "Access to Higher Education" investigates access to higher education in Australia. This paper also discusses the causes of the problems that are faced in the country, their origin and the solutions that be implemented to improve the accessibility to higher education in this country. The government of Australia has been putting policies to ensure that raises the number of adults who have a university degree to 40 per cent by the year 2025. However, several challenges stand in the way of government and attaining this dream of realizing the increased number of university graduates. Such problems include the high cost of university education, the attitudes of the people, preferential treatment of some people by the universities, commercialisation of education, which has led to university graduates not being fully equipped to enable work competitively in the job market. In order to deal with these problems in the Australian higher education, this report has given some recommendations that can improve the accessibility of higher education and help the government to attain the target of increasing the number of adult graduates to 40 per cent. Some of those recommendations include reducing the cost of access to higher education, strengthening the domestic universities t o provide quality education to Australian citizens. Due to the inequality level in accessing education, the government should aim at empowering these people to enable them to compete with the other social classes.

Sunday, January 26, 2020

Power Blackout Preventing By Power Swing Detection

Power Blackout Preventing By Power Swing Detection Power Blackout Preventing By Power Swing Detection  and Out-Of-Step Protection   Power system disturbance, such as fault occurrence, automatic reclosing, and large loads disconnection. These conditions force the generating units to adapt with the new load condition but the generators cant do this instantaneous due to the inertia. This cause a power swing. It may be stable power swing or un stable power swing. In the stable power swing the generator can return to the new equilibrium state. On the other hand, in the un stable power swing the generator cant reach to the steady state operation and run out of step and may lead to the blackout. in the case of power swing the load impedance may enter into the operation characteristic of the distance relay and case unwanted tripping for the transmission lines. So, the distance relay isnt supposed to tripe under the power swing if stable or unstable to give the system the availability to return to its steady state. A power swing block PSB its a function inside the modern distance relays that prevent unwanted tripping by block the tripping signal in case of stable or unstable power swing. However, when the fault happens due to a Power swing it must be cleared very rapidly with high level of dependability and selectivity. Out-of-step trip (OST) in is a function that included in the modern relays to achieve the separation of the power system under the unstable power swing. The major aim of this function to differentiate between the stable and unstable power swing and separate the power system into predetermined zones to achieve the stability and continuity of the service. Key words:  Power Swing Detection; Out of Step Protection; Distance Protection. USA United states of America NERC North American Electric Reliability Corporation N-1criterion Most security rules therefore call for the system to be able to withstand the loss of any single component UCTE Union for the Coordination of the Transmission of Electricity PSB Power Swing Block OOS Out-of- Step OST Out-of-Step Trip TOSB Setting Time of out-of-step Blocking TOST Setting Time of out-of-step Tripping Figure 1 Causes due to different disturbances Figure 2 Two-Machine System model Figure 3 The Power Angle Curve Figure 4 The Equal-Area Criterion (Figure shows a fast fault clearance and a stable swing) Figure 5 Unstable System due to Slow Clearing Time Figure 6 Wrong operation of distance relay due to Power Swing Figure 7 Two-Blinder Power Swing Detection Scheme Figure 8 Automatically sized power swing area. Figure 9 Monotony criterion. Figure 10 Continuity criterion Figure 11 Smoothness criterion. Figure 12 Logic for power swing detection Figure 13 Impedance trajectory for 3-machine power swing Figure 14 Impedance trajectory during stable power swing. Figure 15 Internal fault B-G during a power swing. Figure 16 Internal fault B-G with single pole trip during a power swing. Figure 17 External fault in BC-G during a power swing. Figure 18 Example of a reverse busbar fault during power swing. Figure 19 Rotor angle and impedance trajectories for stable power swing. Figure 20 Rotor angle and impedance trajectories for unstable power swing. Figure 21 Basic signals for out of step detection. Figure 22 Logic for special out of step tripping. In the previous few years we have suffered from big disturbances in the power system which caused complete blackout and millions of users including the industry have suffered from big economical losses. These disturbances cause big fluctuations in active and reactive power, low voltage, voltage instability and angular instability between the generated power and consumed power which results in loss of generation and load which effected on both sides the power generation and the end customers. During the steady state operating condition, the power systems operates on the nominal frequency (50Hz or 60Hz) +/- 0.02 Hz and Voltage=Nominal voltage +/- 5% [1]. The complete synchronism of nominal frequency and voltage at the sending and receiving ends make complete balance of active and reactive power between generated and consumed active and reactive powers. Power system faults, line switching, generator disconnection, and the loss of large blocks of load result in sudden changes to electrical power, which is due to the causes shown in Fig 1. Disturbances Line Switching Generator Disconnecting Paralleling other Generator Addition of load Loss of load Causes Loss of Synchronism Between Voltages Loss of Synchronism Between phase sequence Loss of Synchronism Between phase angles Loss of Synchronism Between frequencies 1.1. Blackout History 1.1.1 Some blackouts became in 2003 (during six weeks). in the northeastern USA and central Canada and in Europe, which affected more than 100 million people. On 14 August the northeastern USA and central Canada: †¢ 62 GW power outage, affected 50 million people. †¢ power supply restoring took some days. On 14 August London †¢ 724 MW power outage, affected 410 thousand people. †¢ power supply restoring took 40 minutes. On 2 September the southern Malaysia †¢ affected 5 states (out of 13) in Malaysia, including the capital Kuala Lumpur. †¢ power supply restoring took 5 hours. On 5 September Birmingham †¢ 250 MW power outage, affected 220 thousand people. †¢ power supply restoring took 11 minutes. On 19 September nine US states and parts of Ontario, Canada †¢ affected 4.3 million people. †¢ cause hurricane Isabel. On 23 September Denmark and Sweden †¢ affected 5 million people. †¢ power supply restoring took 4 hours. On 28 September Italy †¢ affected 57 million people. †¢ power supply restoring took 4 hours. [1], [2], [3] Blackout in the Northeastern USA and Central Canada 14 August 2003 Initially the event was the tripping of the power line that caused by the short circuit to ground due to tree contacts. Blackout in the northeastern USA and central Canada was studied by The North American Electric Reliability Corporation (NERC) and some contravention of safety and reliability standards was identified: †¢ following the outage of the first 345-kV line, dispatcher of the power system did not make the necessary actions to return the system to a safe operating state within 30 minutes to fulfillment of N-1criterion which mean Most security rules therefore call for the system to be able to withstand the loss of any single component. When a power system satisfies this criterion, it is said to be N-1 secure †¢ dispatchers of neighboring transmission system were not informed about this situation. †¢ insufficient training of dispatchers. †¢ functionless monitor system in part of the power system. Reliable and safety operation of the power system The North American Electric Reliability Council (NERC) have developed the operating of the system and planning standards to confirm the reliability and the stability of a transmission network that are depend on seven key concepts: Balance power generation and demand continuously. Balance the reactive power supply and the demand to keep scheduled voltages. Monitor the power flow over the transmission lines and other facilities to ensure that thermal (heating) limits are not exceeded. Keep the system in a stable condition. Operate the system so that it remains in a reliable condition even if a contingency occurs, such as the loss of a key generator or transmission facility (the N-1criterion). Plan, design, and maintain the system to operate reliably. Prepare for emergencies Blackout in Italy on September 28, 2003 The situation in the Italian power system before blackout wasnt exception. †¢ total load of Italy was 27 444 MW. †¢ 3 487 MW pump load. †¢ 6 951 MW physical import to the Italian power system. †¢ some transmission lines in neighboring power systems were out of service by reason of scheduled maintenance. †¢ the Italian power system was connected to neighboring power systems via 15 transmission lines. Sequence of events of the blackout in Italy The initial event was the 380 kV line tripping in Switzerland. Fewer than 25 minutes after this event the Italian power system ceased to operate synchronized to the UCTE system. Union for the Coordination of the Transmission of Electricity 03:01:42 the 380-kV line tripping in Switzerland (Lavorno Metlen) line was heavy loaded at 86%. †¢ The cause of tripping a wire contacted to a tree. †¢ The attempts of single-phase auto-reclosing and also the attempt of the operators to put this line back into operation were not successful and the line was disconnected by its protection device, due to high phase angle (42 °). †¢ After the Lavorno Metlen line tripping, the other 380 kV line in Switzerland (Sils Soaza) became overloaded. 03:11 the Swiss dispatch asked the Italian dispatch to reduce the import of Italy by 300 MW (on scheduled value). 03:25:21 the second overloaded 380 kV line tripping in Switzerland (Sils Soaza). 03:25:25 the third overloaded 380 kV line tripping in Switzerland. 03:25:26 the interconnection line Austria Italy (Lienz Soverenze) tripping. 03:25:33 the Italian power system started to disconnect from the UCTE system After disconnection Italy from the UCTE system the frequency in the Italian power system dropped suddenly, caused by the negative imbalance between power injection to the system and system load. The blackout in the Italian power system became within fewer than 3 minutes. 21:40 official announcement about emergency cancellation in whole power system of Italy. Main causes of the blackout in Italy The initial event was the 380-kV line tripping in Switzerland in consequence of the wire the tree contact. The attempts of single-phase auto-reclosing and also attempt of the operators to put this line back into operation were not successful and the line was disconnected by its protection device, because phase angle was too high. We can see two causes: †¢ insufficient protective zone under the transmission lines. †¢ overloaded lines. After the first 380 kV line tripping in the Swiss power system other power lines became overloaded. That means that the safety N-1criterion was non fulfillment in the Swiss power system. We can see other causes: †¢ Violation of basic safety N-1criterion. †¢ high import to Italy. †¢ incomplete information about neighboring power system. †¢ pump load was stopped too late, by automatics. 1.1.2. System disturbance in the UCTE system on 4 November , 2006 The system disturbance in the UCTE system on 4 November, 2006 was the most serious incident in the UCTE system within an interconnected Europe history. The system disturbance started in the German transmission system on 4 November 2006, around 10 p.m. This disturbance split the UCTE system into three separate parts (West, North-East and South-East). More than 15 million households were affected by an interruption of the electricity. The UCTE system resynchronization was completed 38 minutes after the splitting. [4] What happened? On 18 Sept. 2006, the shipyard (Meyerwerft) sent a request to E.ON Netz to disconnect two 380 kV line Conneforde-Diele for the transport of the ship through the Ems River to the North Sea on 5 November at 01:00. As a switching in the last several times. The E.ON Netz operator did a power flow calculation and verified fulfillment of safety N-1criterion using numerical computation. Analysis did not show any problem and so the operator provisionally approved the request of the shipyard and informed neighbouring transmission system operators (RWE Germany and TenneT Niederland). On 3 November (around 12.00) came a new request to E.ON Netz for a time change of two power lines Conneforde- Diele switching on 4 November at 22:00. A provisional agreement was given by E.ON Netz after a new analysis. But RWE and TenneT operators were not informed about this change at the same time. Only at 19:00 on 4 November E.ON Netz informed TenneT and RWE TSO about the new time for switching off the Diele -Coneforde line. At 21:29 according to the load flow calculation made by E.ON Netz did not indicate any violation of limit values. But N-1criterion was checked without numerical computation, was checked based on an empirical evaluation of the grid situation only. Sequence of events †¢ At 21:38 a 21:39. power lines Conneforde-Diele were disconnected. †¢ At 21:39. after the switching operation, two 380 kV lines was overloaded. †¢ At 21:41. RWE dispatcher informed E.ON Netz about the safety limit value on the line Landesbergen-Wehrendorf (an interconnection line between E.ON Netz and RWE TSO). Later investigation uncovered different protections setting on this line. †¢ Between 22:05 and 22:07, the load on the 380 kV line Landesbergen-Wehrendorf increased and the RWE operator called E.ON Netz at 22:08 with the request for urgent intervention due to return to the stable grid condition. †¢ E.ON Netz made an empirical assessment of corrective switching measures without making load flow estimation for checking the N-1criterion. E.ON Netz expected that coupling of the bus-bars in the substation of Landesbergen would reduce of load on the 380 kV line Landesbergen- Wehrendorf. But this line was overload more than 100% and so was tripped and the other lines became overloaded. †¢ At 22:10:28 the UCTE system splitted to three areas after the power lines switching in E.ON Netz, RWE, the Austrian power system and after disconnection of interconnection lines: Croatia Hungary and Marocco -Spain. The initial event of the system disturbance in the UCTE system was scheduled switching off two power lines. Main causes The investigation identified two main causes of the disturbance as well as some critical factors which had significant influence on its course: non fulfillment of the N-1criterion or verified its fulfillment without numerical computation. †¢ insufficient co-ordination between the transmission system operators. †¢ dissatisfied power plant operation in emergency: tripping of generation units (particularly wind power plants) during disturbance and uncontrolled reconnection of generation units. †¢ limited range of action available to dispatchers. †¢ insufficient training of dispatchers. 1.2. Blackout Causes and Risks A blackout is a power outage. This state means the loss of the electricity supply for a part of the power system or the whole power system. A. Blackout Causes Natural causes Lightening. Rain. Snow. wind storm. Technical Failures Transformer faults. Short circuits. Human error Error of judgment. Insufficient co-ordination between the transmission system operators. Insufficient training of dispatchers. Terrorism Bombing. cyber-attacks. B. Blackout Risks power system equipment damage. heavy economical losses. jeopardy of economy functioning. life paralysis in stricken parts of country. Several blackouts cases became in the world of last years. Causes of these disturbances were various technical, bad weather conditions, human failing. C. Some impacts of Northeastern Blackout Ford Motor Company The stoppage of factorys furnace cause to convert the molten metal to solid metal. The company reported that it need a week to clean the furnace. Marathon Oil Corporations The blackout was responsible for making suddenly shutdown procedures at Marathon refinery. in those procedures, a carbon monoxide boiler failed to shut down correctly, causing a small explosion. As a precautionary measure, the police vacate one-mile sector around the complex. Daimler Chrysler Daimler Chrysler lost production at 14 of its 31 factories. 6 of those were assembly factories with paint shops. The company reported that, in total, 10,000 vehicles were moving through the paint shops during the blackout had to be scrapped. New York City New York Citys mayor estimated that the city would pay almost USD 10 m in overtime related to the outage. Airports Airports were closed in Toronto, Newark, New York, Montreal, Islip, Cleveland, Erie and Hamilton. Together they cancelled over 1,000 flights 2.1. Introduction Under steady state conditions the power generation and the load are balanced and the power systems operate in nominal frequency 50 Hz or 60Hz with some deviations 0.02Hz for the large system and 0.05 for the small system. Taking into consideration the two-machines shown in Fig. 2, the power transmitting can be denoted by the following equation: Where: ES is the voltage of machine S ER is the voltage of machine R ÃŽÂ ´ is the angle by which ES leads ER = QS-QR QS is the rotor angle of machine S QR is the rotor angle of machine R ZT is the total impedance between the two machines consisting of ZS, ZR, and ZL ZS + ZL + ZR ZS is the impedance of source S ZR is the impedance of source R ZL is the impedance of the transmission line The Power angle curve in Figure 3 clears the relation between the power transmit and the angle ÃŽÂ ´ (the angle between the two ends). The relation clear that the power transmit increase with nonlinear direct proportion with the angle ÃŽÂ ´ when ÃŽÂ ´ lie between 0 ° : 90 ° . After ÃŽÂ ´ equal 90 ° the power decrease with nonlinear inverse proportion with the angle ÃŽÂ ´. The power system are worked well at the point of maximum power at ÃŽÂ ´ = 90 ° so The maximum power is presented as the following equation: Power Swing definition It is a changing in the Electrical power due to the changing of the rotor angle (ÃŽÂ ´) either Increasing or decreasing response to : line switching, Load disturbances , loss of generation, short circuit faults and other power system disturbances. During the large disturbance in the power system the transmit electric output power suddenly decreased from P0 to Pf as shown in Fig.4 but the mechanical torque (that connected to the generator and equivalent to the output electrical power P0 at the moment before reducing the electrical power) cant reduce suddenly to equivalent Pf so this unbalance cases accelerating in the rotor of the machine and increasing in the angle (ÃŽÂ ´). The assume of this analysis is neglects the operation of the voltage regulator that control on the excitation and change the machine voltage, and the governors that change the mechanical input power If the fault is cleared at the point of ÃŽÂ ´c the output electric power will increase and become greater than the input mechanical power so the machine will start to decelerate but because of the inertia the machine rotor cant decrease suddenly and reached to ÃŽÂ ´e. Assume area 1 refer to the accelerating energy, and area 2 refer to decelerating energy, so when the fault cleared quickly the two areas can be equal before the angle reach to the limiting angle ÃŽÂ ´L and the system will return after some oscillation to the last operating point at ÃŽÂ ´0 and that call Stable power swing. On the other side if the fault didnt clear quickly and spend more time, the angle ÃŽÂ ´ will move far away enough to make the two areas (accelerating area de accelerating area) not equal before the angle reaches to ÃŽÂ ´L as shown in Fig. 5 and due to the inertia the the angle will reach to the limiting angle and after this point the electrical output power will decrease again to be less than the mechanical input power so the machine rotor will accelerate and the rotor angle will increase above 180 and the pole slipping will happen . this case called out of step condition or unstable power swing condition Power Swing Effect on the Distance Relay Under Steady State Operation the impedance of the load not enter into the operation characteristic of the distance relay but in the case of power swing the load impedance may enter into the operation characteristic of the distance relay and case unwanted tripping for the transmission lines, and may be cause cascading tripping and stoppage of major sections of the power system. The distance relay isnt supposed to tripe under the power swing if stable or unstable to give the system the availability to return to its steady state. A power swing block PSB its a function inside the modern distance relays that prevent unwanted tripping by block the tripping signal in case of stable or unstable power swing thus, The Power Swing Block function is used to differentiate between the power swing and the fault. However, when the fault happens due to a Power swing it must be cleared very rapidly with high level of dependability and selectivity. The zones must be separated hoping to avoid causing large deference of the rotor angle between groups of the generators and loss the synchronism between them, equipment damage and the blackouts. Perfectly, the power system should be separated into predetermined zones to achieve a balance of load-generation in each of the separated zones. In some cases, load shedding is essential to avoid a whole blackout of the area where the load of the separated area is more than the local generation Controlled tripping of the power system relays in the case of an Out-of-Step condition is very essential to prevent extensive outages, equipment damage and shutdown of large areas in the power system. Out-of-step trip (OST) in is a function that included in the modern relays to achieve the separation of the power system under the unstable power swing. The major aim of this function to differentiate between the stable and unstable power swing and separate the power system into predetermined zones to achieve the stability and continuity of the service. Power Swing Detection Methods. Following is a brief discussion of the methods that have been used for detecting power swings and schemes used for OSB and OST functions. Traditional method based on rate-of change of impedance and the recently method is Power-Swing-Detection Algorithm Based on Continuous Impedance Calculation. 2.2.1 Traditional Rate of change of Impedance Schemes for Detecting Power Swings. In the conventional method, the relay measure and calculate the positive sequence impedance and the change rate of the impedance. During the steady sat operation the measured impedance depends on the load impedance and the distance between the protection zone of the distance relay and the point of measurement. The impedance move in trajectory depends on the operation case. In the case of the fault if the impedance moved rapidly to the fault zone. On the other case during the power swing the impedance moved slowly at some trajectory with a rate depend on the slip frequency between the generators. Thus, the variation of the impedance movement speed used to distinguish between the power swing and the faults. The concept of this method that using of two measuring impedance and separated them by ΆZ and used a calculated timer. When the measured impedance moved through the first one the timer will start running. If the measured impedance cross the second impedance before the time r expire, that indicated to a fault case. If the timer expired and the impedance didnt reach to the second impedance that indicated to a power swing case. Two-Blinder Scheme for PSB and OST Functions The two blinder scheme of the rate-of-change of impedance method is used in many relays, separated by ΆZ, and a calculated timer TOSB. The two-blinder scheme is shown in Fig. 7. This figure shows Two parallel blinders are on the right side of the X-line impedance and another two parallel blinders are on the left side. The timer TOSB is start running when the impedance move through the outer blinder During the fault condition the impedance moved rapidly through the outer blinder to the fault zone and cross the inner blinder before the TOSB expire. On the other case during the power swing the impedance moved slowly through the outer blinder and stay between the two blinders even TOSB will expire. This scheme can be used for a power swing blocking function to block the distance relay to prevent unwanted tripping. During Power Swing Blocking declared a reset timer should be used in order to force the relay to delay the assert when TOSB expired. The Out-Of-Step tripping (OST) can use the previous scheme expect that the calculated timer for out of step (TOST) is shorter than TOSB. In the case of power swing the impedance locus cross the outer blinder and at this point the timer will start running. If the timer TOST expires before the impedance locus cross the inner blinder, the power swing condition will declare, and if the impedance locus cross the inner blinder before timer TOST expires, the out of step condition will declare. The Out-Of-Step tripping function can be set to tripe instantly or wait for a time. The Instantly tripping referred to as predictive tripping or early tripping. The other case is referred to as delayed tripping. In some applications, the tripping is required only when the out of step condition occurs a determined number of times. It is essential for some application to use both OSB and OST functions, and it available to use them in the Same relays using the two blinder scheme technique. According to difference in speed of impedance trajectory in the case of stable power swing and unstable power swing, two timers are required TOSB and TOST whereas TOST is shorter than TOSB to be fit with the rapidly speed of the impedance trajectory in case of unstable power swing 2.2.2. Power Swing Detection Algorithm Based on Continuous Impedance Calculation The traditional methods of power swing detection are depend on a complex study for the power system to reach to the correct settings, but the setting are fixed and not adapt to any change in the system condition because of it is not possible to study the system under unstable power swing. therefore, the power system study doesnt deem the worst cases and the bad conditions, so in the case of power swing or out of step condition it may lead to unwanted tripping. The following method described below solves these problems. It is based on a continuous impedance calculation [5]. This method has the following features: It is not required for settings or complex calculation detect the power swing with frequencies range from 0.1: 10 Hz. Detect the power swing in the case of single-pole open condition or fault condition. Unblocking of distance protection relay if there both faults and power swing. Out-of-step tripping during unstable power swing. The Continuous Impedance Calculation method depend on taking four sample of the impedance per one cycle of the power system frequency the three phase each phase separately. During the power swing the impedance trajectory moved on an oval path, and when it enters the power swing area, as shown in Figure 8, the algorithm of power swing start its analysis for each phase and calculate the power swing area automatically. In the case of power swing, the power swing detection will detect it, and stay active even if the trajectory of the impedance leave the power swing zone. The algorithm computes the new values of R X, and compares them with the previous values that placed in the memory. The main criterias of the power swing detection methods are monotony, continuity and smoothness. The thresholds are calculated dynamically. This automatic adaptability to the trajectory speed change, enables the algorithm to detect the low frequency and the high frequency power swing. Monotony: The algorithm will check the direction of the derivat